Our energy projects
Information about our ongoing projects
We develop energy projects throughout Finland
We develop energy projects that contribute to the green transition and strengthen the stability of the electricity system. Battery storage is a central part of the energy infrastructure of the future, enabling balance control, frequency stabilization, and efficient integration of renewable energy.
We are currently developing around 30 solar energy projects with a total capacity of approximately 1200 MW. A typical solar park has a capacity of 20–200 MW, but we are also developing smaller facilities in the range of 500 kW–20 MW. Of these projects, approximately 10 are hybrid parks that combine solar power with battery storage, enabling increased flexibility and improved grid integration.
At the same time, we are developing 12 battery energy storage projects (BESS) with a total planned capacity of approximately 1600 MW. The size of the projects varies from 2 MW to 350 MW, and they are geographically spread from Muhos in the north to Inkoo in the south. Our projects are at different stages of development – from early planning to obtaining permits and starting construction. The largest battery storage project that has been granted a building permit to date has a capacity of 125 MW / 500 MWh, and the largest solar park with an approved building permit amounts to 108 MWp.
Ongoing projects
Åback
Kristiinankaupunki
Capacity: 400 MW / 1600 MWh
Phase: Planning phase
Toholampi
Toholampi
Capacity: 350 MW / 1200 MWh
Phase: Planning phase
Nivala
Nivala
Capacity: 50 MW / 200 MWh
Phase: Planning phase
Kroppikangas
Loimaa
Capacity: 30 MW / 120 MWh
Phase: Planning phase
Koppelonsuo
Suonenjoki
Solar park capacity: 79 MWp
Energy storage capacity: 30 MW / 60 MWh
Phase: Planning phase
Muhos
Muhos
Capacity: 30 MW / 120 MWh
Phase: Planning phase
Annis
Kristiinankaupunki
Capacity: 125 MW / 500 MWh
Phase: Planning phase
TeuWatt
Teuva
Capacity: 80 MW / 320 MWh
Phase: Planning phase
Alifällans
Pedersöre
Solar park capacity: 30 MW
Energy storage capacity: 30 MW / 120 MWh
Phase: Planning phase
Björkkärr
Loviisa
Solar park capacity: 40 MW
Energy storage capacity: 30 MW / 120 MWh
Phase: Planning phase
Hällbacka
Inkoo
Solar park capacity: 30 MW
Energy storage capacity: 30 MW / 120 MWh
Phase: Planning phase
Vassor
Mustasaari/Vöyri
Solar park capacity: 25 MW
Energy storage capacity: 30 MW / 120 MWh
Phase: Planning phase
Vikom
Nauvo
Solar park capacity: 10 MW
Phase: Planning phase